Underfloor heating in a renovation, with no screed and no channels to cut.

In renovation, three answers keep coming up: cutting channels into the screed, laying a thin water-based system, or a dry system. All of them need water, a manifold and a heat generator. The fourth is electric and is 5 mm thick.

The short answer

Yes, underfloor heating can be added without pouring a screed and without cutting channels into the one that is there. The system is 5 mm thick: a reflective layer, an insulating layer, a carbon film. It is laid on the floor already in place, and the new floor covering goes on top. No pipes, no drying time.

The height, floor covering included

This is the figure that counts in renovation: it decides what happens to the doors, the thresholds and the skirting boards. Indicative values from the manufacturer, 5 mm of heating included.

Floor covering Build-up Height added
Click vinyl, floating vinyl from 8 mm 13 to 16 mm
Laminate, floating laminate from 10 mm 15 to 19 mm
Three-layer engineered wood, floating the most common case 16 to 20 mm
Glued-down wood flooring on a decoupling mat 19 to 25 mm
Tiles on a decoupling mat 23 to 38 mm
Thin vinyl or glued floor covering on a dry screed of 18 to 23 mm 27 to 35 mm
Tiles on a dry screed 35 to 40 mm
Solid wood flooring, large planks on a dry screed 35 to 45 mm
Epoxy resin, decorative screed on a 25 mm fibre-reinforced cement screed, with its manufacturer’s agreement and a heating-up protocol 38 to 50 mm

The last row is the only one where a screed is poured, a thin one, for a resin floor: it falls outside the general case of this page.

For comparison, the manufacturer gives 15 to 30 mm for a thin water-based system, without insulation or floor covering, and 45 to 65 mm for water-based underfloor heating cast in a screed.

The details by floor covering: wood flooring, vinyl and laminate, tiles.

The weight

System Weight, without the floor covering For the structure
Carbon underfloor heating about 1.25 kg/m² no effect
Thin water-based system, with levelling compound 15 to 35 kg/m² to be checked
Water-based underfloor heating in a 45 to 65 mm screed 90 to 130 kg/m² structural assessment

The manufacturer’s figures. On a timber floor, in a loft or on an added storey, this is often the deciding factor: the page added storey, loft, extension covers this case.

What is needed in your home

  • A dry, sound and flat floor: a deviation of 2 mm at most over one metre. Beyond that, a levelling compound first.
  • Electricity, no plant room: 230 V, with no transformer, no manifold, no outdoor unit. The electrician checks the circuit protection for each room.
  • A water heater if the old heating also produced the hot water.

How the job goes

  1. Check of the existing floor.
  2. The reflective layer is rolled out, silver side up; then the insulating layer.
  3. The strips of film are laid side by side; the electrician connects them, room by room, through a thermostat.
  4. The floor covering is laid straight away.
  5. Check with the thermal camera, then handover.

The course of a day, hour by hour, is on the home page. The steps, from design to handover, are on the page fitting, step by step.

Where 5 mm is not enough

  • An uneven floor needs a levelling compound.
  • Tiles always need a mat or a dry screed: 23 to 40 mm.
  • Glued-down wood flooring needs a decoupling mat: 19 to 25 mm. Solid or in large planks, it needs a dry screed: 35 to 45 mm.
  • The shower itself and the space under fixed furniture stay without film.

To find out which build-up suits your home, send photos of the floor, the clearances under the doors and the floor covering you want: describe your project.

Updated on 9 October 2026.

Frequently asked questions

Your questions on this subject.

Does the old floor covering have to be removed?

Most often, no. Tiles, screed, floorboards or vinyl stay in place if the floor is dry, sound and flat to within 2 mm over one metre. A floor covering that has come loose or is damp is removed or made good first.

Can it be laid on a timber floor?

Yes. At 1.25 kg per square metre, according to the manufacturer, the weight is no burden on the structure. The floor must be sound and flat.

Will the doors have to be trimmed?

It depends on the height added: 13 to 16 mm with click vinyl, 16 to 20 mm with floating wood flooring. If an old floor covering is removed, the manufacturer states that the doors generally do not have to be trimmed. We check this at the survey.

How long does the fitting take?

According to the manufacturer, one to two rooms a day, floor covering included; an apartment of around a hundred square metres was fitted out in one working day. No channels to cut, no screed to leave to dry.

Can we stay at home during the work?

Yes: we proceed room by room, with no dust from cutting channels and no wet screed. The other rooms remain habitable.

My home is poorly insulated. Is that an obstacle?

Insulation is not a condition for fitting. It weighs on consumption, as with any heating: the manufacturer has measured 23 to 64 kWh per m² per year in old, uninsulated buildings.

Got a heat pump quote sitting on your desk?

One call, and we send you the Carbosol equivalent for the same area, on one page. Free, and without us calling you back every three days.

Free quote Call Andrei

Carbosol, even without a network

Install the app

The site then opens like an app, from your home screen.

Use the site offline

For a trade fair or a site with no network: the whole site is copied to this device, simulator and contact cards included. You delete the copy whenever you like.

What to copy